Project Description

Client:

GHD/Aecom

Project Value:

Confidential

Project Design:

GHD/Aecom

WT assisted GHD/Aecom with preparation of high level costings for a set of design options for the redevelopment of the Port. We used our in-house knowledge and data to cost a set of 11 options to aid in the assessment of designs going forward.

The cost planning included dredging (including swing basins); land reclamation; land clearance; service infrastructure; civil infrastructure (road, bridges, rail and terminals); wharf construction (open piled structures and bulk haul land based wharf structures); cathodic protection; crane rail and stacker train infrastructure; land side buildings and facilities and navigation equipment.