Infrastructure Cost Engineering

CityLink Tullamarine Freeway Widening, Vic

,

CityLink is working with the Victorian Government to upgrade 19 km of the CityLink - Tullamarine Freeway corridor providing 33 km of new traffic lanes.

Port of Melbourne Port Capacity Program (Webb Dock)

, ,

Construction of a new container terminal at Webb Dock East, New Automotive terminal at Webb Dock West, Automotive PDI Facilities and infrastructure upgrades to Swanson Dock.

Canberra Capital Metro Project

, ,

Capital Metro is Canberra's light rail project and an important part of the ACT Government’s vision to deliver a truly sustainable and creative city. It is the first stage of a city-wide integrated transport network. The 12 km stage one light rail route will link Canberra's city centre with the growing suburbs of Gungahlin via Northbourne Avenue and Flemington Road with a 5 km extension to the suburb of Russell.

Transport Access Program, Sydney

WTP has been engaged by Transport for New South Wales (TfNSW) to provide Cost Management services for their Transport Access Program (TAP).

E-Gate, Melbourne

, , ,

WT Partnership provided Major Projects Victoria with high level cost estimates for infrastructure works associated with the redevelopment of 25ha of land between Docklands and North Melbourne.

Port of Hastings, Vic

To date WTP has assisted GHD/Aecom with preparation of high level costings for a set of design options for the redevelopment of the Port.

EastLink, Vic

, ,

EastLink is a 45 km tollway which connects Melbourne's eastern and south-eastern suburbs between the existing Eastern, Monash and Peninsula Freeways.

BHP Olympic Dam Expansion Project, South Australia

, ,

Located 560 km north of Adelaide, South Australia, Olympic Dam is a multi-mineral underground mine. It is the world’s fourth largest remaining copper and gold deposit and the world’s largest known uranium deposit. It also contains significant quantities of silver.

Creekwood at Caloundra, Queensland

Subdivision of 50 hectares of land land to provide 330 land subdivision lots and 46 home sites together with 9 hectares of public park land over nine stages.

Ascot Chase, Newson Street, Ascot Vale

,

The development included approximately 400 dwellings on 16 hectares of land bounded by Walter Street, the Walter Street Reserve, Newsom Street, Stanford Street and Doncaster Street in Ascot Vale.

Bonnyrigg (New Leaf), NSW

, , ,

WTP has been involved in this project since the bid phase and provided quantity surveying services to Becton and the Department on all dwellings, remediation, road works, footpaths, inground services, WSUD, open space (active and passive), street lighting, street furniture, landscape embellishments and road junctions/intersections.

Westall Rail Upgrade Project, Victoria

To improve service reliability along the corridor upgrades were required at Westall including the construction of 2.7 km of third track between Centre Road and Springvale Road and additional overnight storage space for five trains at the Westall stabling depot.

Williams Landing Station, Victoria

Construction of a new premium station and a new overpass on Palmers Road to provide transport access to the Williams Landing housing estate, located in one of Melbourne's growing suburbs.

Sydney Monorail Decommissioning & Removal

WTP was engaged in 2012 to prepare detailed cost estimates for the works involved for the closure of all the stations, terminating the ticketing, power and other services, and removing the train sets from the track at the maintenance facility on Darling Drive along with removal of the support columns.

Metro Trains Capital Works Program, Victoria

A number of WTP’s staff were seconded to Connex (and then Metro) to provide estimating, cost planning and contract administration services for Metro Trains CAPEX program across Melbourne’s metropolitan train network.

myki Ticketing Infrastructure, Victoria

,

myki is a smart card ticketing system which replaced Metcard and V/Line tickets and paper tickets on Victoria’s trams, trains and buses.

East Coast Network Freight Rail Study

Improvement projects ranging from $10 million to $800 million including new rail works, river crossings, station relocations, bridges and underpasses, road widening, bridge re-building and new road construction.

Craigieburn Train Maintenance Facility, Victoria

To accommodate 38 new X’Trapolis trains additional storage and maintenance facilities were required at Craigieburn Train Station. The works included the construction of an additional nine train roads, a new maintenance facility, a train wash bay and a staff amenities building.

Clifton Hill Rail Project, Victoria

Second rail track for 750 metres between Clifton Hill and Westgarth stations including a new rail bridge was constructed over Merri Creek

Cardinia & Lynbrook Stations, Victoria

WTP worked with Arup to cost the design for the new which included station platforms, concourses, car parking and associated rail works.

Kings Avenue Overpass, Canberra

Parkes Way was lowered and a new bridge constructed to carry Kings Avenue traffic at its existing level over Parkes Way.

APLNG Condabri & Orana Project, Queensland

,

WT Partnership is worked as part of the APLNG Origin Project Management, Design, Procurement and Delivery Team on the Condabri and Orana Gathering and Wellhead Facilities Project.

Green Square Town Centre, Sydney

Green Square Town Centre will be the commercial, retail and cultural heart where people live, work, shop, dine out, are entertained and enjoy a range of cultural activities.

QCLNG Export Pipeline, Narrows Crossing

QGC, a BG Group Business entered into an engineering, procurement and construction contract with McConnell Dowell Constructors and Consolidated Contracting Company Australia for the ‘Narrows Crossing Contract’ as part of its Export Pipeline Contract in Gladstone / Curtis Island which is part of the Queensland Curtis LNG project

OzMinerals Carrapateena Advanced Exploration Project, SA

WT Partnership was engaged in 2013 to assist OZMinerals in setting of budgets and cost control for a pre-feasibility and feasibility study including an exploratory decline at their Carrapateena Mine located 160 km North of Port Augusta.

Petroleum Offloading Facility, QLD

In 2010, Neumann Petroleum commissioned a new bulk fuel terminal on the Port of Brisbane owned pier at Eagle Farm to facilitate increased deliveries to the existing tank farm located further upriver.

Melbourne Airport Runway Widening

The Runway Widening Project was the largest single airfield construction project undertaken in the airport’s 35-year history and was the major stage of Melbourne Airport’s A380-Ready Development Program.

PNG LNG Komo Airfield, PNG

The airfield is located 10 km services the landmark PNG LNG project southern highlands of Papua New Guinea.

Barangaroo Headland Park, NSW

, ,

Barangaroo Headland Park will provide a new vantage point for Sydneysiders and visitors alike to watch the action on Sydney Harbour at the same time as they soak up the atmosphere of six hectares of lush, naturalistic parkland.